Section 7: Pump Installation And Venting; Mounting Wall Bracket Assembly; Figure 10: Wall Bracket Assembly; Figure 11: Mounting Platform Options - Roberts Gorden CRT-10 Installation, Operation & Service Manual

Corayvac series custom-engineered, low-intensity infrared heating systems
Table of Contents

Advertisement

®
CORAYVAC
I
NSTALLATION

SECTION 7: PUMP INSTALLATION AND VENTING

7.1 Mounting Wall Bracket Assembly

WARNING

Figure 10: Wall Bracket Assembly

Description
Part Number
Mounting Angle
Bolt M8 x 25 mm
Nut M8
Washer
Lockwasher

Figure 11: Mounting Platform Options

Description
Anti Vibration Mounting Kit
Anti Vibration Mount
Hex Nut
Washer
Lockwasher
24
O
S
M
PERATION AND
ERVICE
Crush Hazard
Mount pump with materials
with a minimum working
load of 181 kg (400 lbs).
Failure of the supports can
result in death, injury
or property damage.
01365000
S280
S248
S264
S260
Part Number
E0009238
91906100
92113900
95211600
96411600
ANUAL
7.1.1 Mounting Platform
The standard method of mounting the RG-30 and
RG-45 pump is on an outside wall and venting
directly through the wall or roof.
The pump may be mounted by using mounting
angles as shown in Figure 10 and Figure 11. The
two mounting angles form a mounting platform to
which the pump will be attached using the anti-
vibration mounts.
Fix the mounting frame to the wall using anchors.
Select an anchor that will give equal to or greater
than 907 kg (2000 lbs) ultimate pull-out strength.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Crt-15Crt-30Crt-20Crt-25

Table of Contents