Carrier 19XR Start-Up, Operation And Maintenance Instructions Manual page 99

Hermetic centrifugal liquid chillers 50/60 hz with pic ii controls and hfc-134a
Hide thumbs Also See for 19XR:
Table of Contents

Advertisement

Fig. 47 — Typical Primary Reactor Starter Wiring Schematic (Medium Voltage)
LEGEND
AUX
Auxiliary
C
Contactor
CB
Circuit Breaker
COMM
Communication
COND
Condenser
CPT
Control Power Transformer
CR
Control Relay
CT
Current Transformer
DS
Disconnect Switch
EVAP
Evaporator
FU
Fuse
G
Ground
GFCT
Ground Fault Current Transformer
HPR
Horsepower
ISM
Intergrated Starter Module
L
Main Power Supply
LL
Control Power Supply
LVG
Leaving
M
Contactor
MTR
Motor
PRESS
Pressure
PT
Power Transformer
ST
Shunt Trip
STAT
Status
TB
Terminal Block
TRANS
Transition
VFD
Variable Frequency Drive
VL
Wire Label
Starter Vendor Power Wiring
Starter Vendor Control Wiring
Field Installed Power Wiring
(supplied by others)
Field Installed Control Wiring
(supplied by others)
Option — Starter Vendor Wiring
Twisted Pair Wiring by Starter Vendor
Customer Terminal Connection

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents