Carrier 19XR Start-Up, Operation And Maintenance Instructions Manual page 97

Hermetic centrifugal liquid chillers 50/60 hz with pic ii controls and hfc-134a
Hide thumbs Also See for 19XR:
Table of Contents

Advertisement

NOTES:
LED status with power applied and prior to run command.
1
Transformer T1 primary fuses FU1/FU2 value dependent on system voltage and model, per Chart 1.
2
Transformer connections per transformer nameplate connection diagram.
MOVs are used on power stack assemblies for system voltages of 200 thru 460 vac (as shown). Resistor/
capacitor networks (DVDTs) are used on power stack assemblies in place of MOVs for a system voltage
3
of 575 vac (not shown).
K3 relay shown in deenergized state. K3 contact will close when power is applied. K3 contact will open
4
on stop command or system fault.
AUX
''ON''
BR
CB
COMM
''OFF''
COND
CPU
CVC
CT
EVAP
FU
Fig. 45 — Benshaw, Inc. Solid-State Unit Mounted Starter Wiring Schematic (Low Voltage)
Auxiliary
G
Ground
Bridge Rectifier
L
Main Supply Power
Circuit Breaker
LL
Control Power Supply
Communication
M
Contactor
Condenser
O/L
Overload Reset
Central Processing Unit
S
Contactor
Chiler Visual Controller
SCR
Silicone Controller Rectifier
Current Transformer
ST
Shunt Trip
Evaporator
TB
Terminal Block
Fuse
LEGEND
Wire Node Symbol
may have terminal block
Benshaw supplied
terminal block
Terminal Strip
Power Connection
PC Board Terminals
Twisted Pair
Twisted Shielded Pair
Shield Wire
Field Wiring

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents