Liebert PX018 Installer's/User's Manual page 66

Pdx and pcw series thermal management systems, 3 to 8 ton (11 to 29 kw) capacity, upflow and downflow, 60 hz
Table of Contents

Advertisement

Resistance readings should be greater than 2 Ohm.
EC-fan Low-voltage Tests
NOTE: Use the GND in the KL3 connector. Do not connect the control ground to the PE in KL1!
Vertiv | Liebert® PDX™ and PCW™ Installer/User Guide |
Check all connections. Make sure connections are on the wire strand and not on
the wire insulation.
Replace Fuses.
Check mains voltage at each phase (phase to ground) at the KL1 connector.
Confirms phase failure not present.
Check that the voltage is within the acceptable voltage range at the KL1
connector. Confirms line under-voltage is not present.
Check control input at the KL3 connector (Ain1U to GND). Confirm that there is a
control voltage present at the KL3 connector.
Check +10 V output on KL3 connector (between +10 V and GND).
66

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pw011Px011Px029Px023Pw017Pw029

Table of Contents