POSITIONS OF AIR CONDITIONER BODY AND CEILING SURFACE
Tighten the nut and bolt to prevent unit from falling
Warning
HANGING POSITION OF THE AIR CONDITIONER BODY
Air conditioner body gap setting
between ceiling surface should
be 10mm as right figure.
(Adjustment of height direction
should be done after fixing
decorative panel.)
11.8.4 REFRIGERANT PIPING
Refrigerant is charged to the outdoor unit. For details, see the manual for installation work of outdoor unit. (Additional
charging, etc.)
1.
Brazing for piping.
a. Execute brazing before tightening the flare nut.
b. Brazing must be executed while blowing
nitrogen gas. (This prevents generation of
oxidized scale in copper pipe.)
2.
When there is a lot of brazings for long piping,
install a strainer midway of the piping. (The
strainer is locally supplied.)
3.
Use clean copper pipe with inner wall surface
free from mist and dust. Blow nitrogen gas or air
to blow off dust in the pipe before connection.
4.
Form the piping according to its routing. Avoid
bending and bending back the same piping point
more than three times. (This will result in
hardening of the pipe).
5.
After deforming the pipe, align centers of the
union fitting of the indoor unit and the piping, and
tighten them firmly with wrenches.
6.
Connect pipe to the service valve in the outdoor
unit.
Vacuum drying
After completing the piping connection, execute vacuum drying for the connecting piping and the indoor unit.
The vacuum drying must be carried out by using the service ports of both the liquid and gas side valves.
CAUTION Use two wrenches and tighten with regular torque.
Flare nut fastening torque N•m (kgf•cm)
ø6.35
18 (180)
ø9.52
42 (430)
Hanging bolt
(W3/8 or M10)
Nut
(W3/8 or M10)
M10 Spring washer
Keep the length of the bolt
from the bracket as 40 mm
Ceiling
ø12.7
55 (560)
ø15.88
65 (660)
Flat washer for M10 (accessory)
Flat washer for M10 (accessory)
Nut
(W3/8 or M10)
Air
conditioner
Paper model for
installation
Place the screws for paper model
7.
After completed the piping connection, be sure to
check if there is gas leakage in indoor and
outdoor connection.
Confirm the round mark of the union (thin side) is
always at lower direction after connecting piping.
Cooling capacity
2.2kW - 6.3kW
7.1kW or more
128
Ceiling
Open the ceiling board along the
outer edge of the paper model
(4 pieces)
Union
round mark
Liquid piping
Gas side piping
ø6.35mm
ø12.7mm
ø9.52mm
ø15.88mm