Xtreme Ice - Kits; Bin Stat Kit, P/N 630000408; Installation Instructions - Cornelius XAC 1444 Service Training Manual

Xtreme ice xac series; xwc series; xrc series;
Hide thumbs Also See for XAC 1444:
Table of Contents

Advertisement

Xtreme Ice Training Manual

BIN STAT KIT, P/N 630000408

Installation Instructions

These Bin Stat kits apply to all "X" Series Ice makers.
Item No.
Part No.
1
630000837
2
07578
3
630460162
4
630900895
5
620045454 or
620045455 or
620045456 or
620045457
1. Disconnect power.
2. Remove front cover of the unit and the electrical box cover plate. For 22" wide units you will need to
remove the Grill from the right side of the unit.
3. To mount bin thermostat in electrical box:
A.
Route wires and connector through grommet in electrical box (see Figure 18).
B.
Attach bin thermostat to electrical box with two 08–32 TC screws provided (see Figure 18).
4. Connect the bin thermostat lead to the circuit board (see Figure 19).
5. Straighten approximately 12" of capillary tube to go through hole in chassis base. Re–coil the re-
mainder. Do not disturb the tightly coiled end.
6. Insert the "1/4" diameter wire Bin Stat support into the coiled end of capillary tube. Carefully wrap 5
turns of free capillary tube tightly around the Bin Stat support. Insert the assembly through the hole
in the chassis base. Route capillary tube to follow the Bin Stat support as closely as possible (see
Figure 20).
7. Slip eye of Bin Stat support over the 8–32 weld stud in the chassis base. If a nut exists on this weld
stud remove before assembling the Bin Stat support. Secure the Bin Stat support with the 8–32
Keps nut provided in the kit (see Figure 20).
8. Any excess capillary tubing must be carefully pulled back into the compressor compartment to pre-
vent ice from damaging it during dispenser operation.
9. Seal ½" diameter hole with sealant (RTV).
10. Turn bin stat adjustment screw clockwise until it stops. Then turn it counterclockwise 1/8 of a turn.
11. Reinstall the front cover of the electrical box and the ice machine and reconnect the power. Verify
that the Bin Stat is working by holding ice on the coiled bare capillary tube. The bin stat will allow the
ice machine cycle to complete and harvest ice. Then the ice machine will shut down. Remove the ice
from the capillary tube and warm the tube with hand heat. The ice machine should start in approxi-
mately 60 seconds. Reinstall front cover and grill (22" units only).
October 17, 2005
XTREME ICE – KITS
Loose–Shipped Parts
Name
Thermostat Asy
Screw TC 08–32
Installation Instruction, Thermostat
Hex Nut 8–32 SS Keps
Bin Stat Support
43
Qty.
1
2
1
2
1
TP00952

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents