Chapter 3: Installation
Surface mounting
2. Apply the surface mount template (supplied at the rear of this hand-
3. Drill out the two 5 mm fixing stud clearance holes (2).
4. Cut out the clearance hole (3) then remove the template.
5. Peel off the protective sheet from the self-adhesive gasket (4) then
6. Screw the two fixing studs into the threaded sockets on the rear of the
7. Mount the assembled instrument, studs, bezel and gasket into the
Flush mounting
The Flush Mounting Kit uses a low-profile bezel to reduce the fitted
profile of the instrument, to approximately 6 mm above the panel fascia.
book) to the selected location and mark the centres for the fixing studs
(1) and the aperture (3) that will take the rear casing of the instrument.
stick the gasket into position on the rear of the instrument.
instrument.
panel. Secure from behind with the thumb nuts (5).
4
1
2
1
3
5
2
5
D4343-2
19