CPU MODULE START-UP PROCEDURES
(Continued from the previous page)
Installing a battery
Install a battery to the CPU module.
Powering ON the power supply module
Confirm the following items of the safety programmable controller system, and then turn on
the power supply.
Wiring of the power supply
Power supply voltage
Operating status of the CPU module
in the STOP position.)
Confirming the CPU module LEDs
Confirm that the "ALIVE" LED and "TEST" LED of the CPU module are on.
(Confirm that the CPU module is in TEST MODE.)
Connecting a personal computer in which GX Developer is installed
1) Start up GX Developer on the personal computer in which GX Developer is installed.
2) Connect the personal computer with GX Developer installed, to the CPU module.
Initializing the PLC memory of the CPU module
Initialize the PLC memory of the CPU module with GX Developer.
Registering the CPU access password with the CPU module
Register the CPU access password with the CPU module by using GX Developer.
Setting clock data and clearing history data of the CPU module
When the safety CPU module is operated for the first time after purchase, take the following
actions for the CPU module with GX Developer.
Set the clock with "Clock setup".
Clear the error history of the CPU module with "PLC diagnostics".
1
Writing the parameters and programs to the CPU module
Write the parameters and user programs created by GX Developer to the CPU module.
Restarting the system
Turn off and then turn on the system power supply, or reset the CPU module.
Running the CPU module
Set the RUN/STOP/RESET switch of the CPU module to the RUN position.
Confirm that the "ALIVE" LED, "RUN" LED, and "TEST" LED of the CPU module are on.
Checking the user program operation
Check the user program operation, cables, and inputs/outputs.
When the "ERR." LED of the CPU module is on or flashing, identify the error cause by the
diagnostics*
2
of GX Developer to eliminate the error cause.
When the error is related to the parameters or programs, correct them.
Stop status (The RUN/STOP/RESET switch is
(To the next page)
* 2: The following types of diagnostics are available.
• PLC diagnostics
• Ethernet diagnostics
• CC IE Control diagnostics
• CC IE Field diagnostics
• MELSECNET diagnostics
• CC-Link / CC-Link/LT diagnostics
• System monitor
8.1 Procedure before Operating in SAFETY MODE
CHAPTER 7
CHAPTER 4, CHAPTER 5,
CHAPTER 10
CHAPTER 4
GX Developer Version 8
Operating Manual (Safety
Programmable Controller)
GX Developer Version 8
Operating Manual (Safety
Programmable Controller)
GX Developer Version 8
Operating Manual (Safety
Programmable Controller)
GX Developer Version 8
Operating Manual, GX Developer
Version 8 Operating Manual (Safety
Programmable Controller)
GX Developer Version 8
Operating Manual
CHAPTER 4
CHAPTER 4
CHAPTER 4
8
1
2
3
4
5
6
7
8
- 2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents