BATTERY

7.1.2 Installation of Battery

The battery for the CPU module is shipped with its connector disconnected. Connect
the connector as follows.
Refer to Section 11.3 for the service life of the battery and how to replace the battery.
POINT
Open the CPU module front cover.
Confirm that the battery is loaded
correctly.
Insert the battery connector into the
connector pin on the case. Be sure that
the insertion direction is correct.
Completed
Figure 7.1 Q6BAT battery setting procedure
Firmly push the connector all the way.
CPU module
BA T.
ST OP
B A T .
RU N
RE SE T
Connector
7.1 Battery (Q6BAT)