Switching Power On; Operation; Figure 11. Keypad - Comtech EF Data DT-4572 Installation And Operation Manual

X-band down converter
Hide thumbs Also See for DT-4572:
Table of Contents

Advertisement

DT4572 X-Band Down Converter
System Operation
3.2 S
WITCHING
Before turning the Prime Power Switch to the ON position, check to ensure that the
installation is complete, and verify that the converter is connected to the proper prime
power source, RF Input and IF Output.
Switch the ON/OFF Prime Power Switch on the rear panel to ON. Verify that the
cooling fan is operating, and that the POWER ON LED STATUS indicator light is on.
After the AC power is switched on and before pressing the buttons on the key-pad, the
LCD display message should be similar to:
DT-4572
SW VER 4.06
3.3 O
PERATION
Local operation of the RF Down Converter is controlled by operator input commands
initiated through the six button key-pad on the front panel shown in Figure 11. The key-
pad is the local operator's interface to control, configure and monitor the status of the
converter. Operator inputs and commands entered into the key-pad are displayed by the
front panel twenty-four character, two line, LCD display. See Appendix B for Remote
Control.
There are six operating command functions: Configuration, Pre-Select, Monitor Status,
Currents Faults, Stored Faults and Utility Functions. A flow chart for selecting the
commands, operating menus, and data inputs is shown in Figure 12 through Figure 20.
P
ON
OWER
SN4572XXXX

Figure 11. Keypad

ENT
CLR
17
Rev. 0
MM/DT4572.IOM

Advertisement

Table of Contents
loading

Table of Contents