Daikin VAM350J7VEB Installer And User Reference Manual page 2

Heat reclaim ventilation unit
Hide thumbs Also See for VAM350J7VEB:
Table of Contents

Advertisement

Table of contents
Table of contents
1 General safety precautions
1.1
About the documentation ..........................................................
1.1.1
Meaning of warnings and symbols..............................
1.2
For the user ...............................................................................
1.3
For the installer..........................................................................
1.3.1
General .......................................................................
1.3.2
Installation site ............................................................
1.3.3
Refrigerant ..................................................................
1.3.4
Brine............................................................................
1.3.5
Water ..........................................................................
1.3.6
Electrical .....................................................................
2 About the documentation
2.1
About this document..................................................................
For the installer
3 About the box
3.1
Overview: About the box ...........................................................
3.2
Heat reclaim ventilation unit ......................................................
3.2.1
To unpack the heat reclaim ventilation unit.................
3.2.2
To remove the accessories.........................................
3.2.3
To handle the heat reclaim ventilation unit .................
4 About the units and options
4.1
Overview: About the units and options......................................
4.2
Identification ..............................................................................
4.2.1
Identification label: Heat reclaim ventilation unit .........
4.3
About the heat reclaim ventilation unit ......................................
4.4
Combining units and options .....................................................
4.4.1
Possible options for the heat reclaim ventilation unit ..
5 Preparation
5.1
Overview: Preparation............................................................... 10
5.2
Preparing the installation site .................................................... 10
5.2.1
Installation site requirements for the heat reclaim
ventilation unit ............................................................. 10
5.3
Preparing the unit ...................................................................... 10
5.3.1
To install the optional adapter printed circuit board .... 10
5.3.2
To install the duct joints .............................................. 11
5.4
Preparing the electrical wiring ................................................... 11
5.4.1
Wiring connection ....................................................... 11
5.4.2
Component electrical specifications............................ 12
5.4.3
Specifications for field supplied fuses and wires......... 12
5.5
Preparing the installation of the ducts ....................................... 13
6 Installation
6.1
Service space: Heat reclaim ventilation unit.............................. 13
6.2
Unit orientation .......................................................................... 13
6.3
To install the anchor bolts ......................................................... 14
6.4
Duct connections....................................................................... 14
6.5
Electrical wiring ......................................................................... 15
6.5.1
Precautions when connecting electrical wiring ........... 15
6.5.2
Opening the switch box............................................... 16
6.5.3
Electrical connections for possible additional field
supplied damper ......................................................... 19
6.5.4
Power supply connection, control wire terminals and
switches on the circuit board....................................... 19
6.5.5
Guidelines when connecting the electrical wiring ....... 19
7 System configuration
7.1
About control systems ............................................................... 20
7.2
Independent system .................................................................. 21
7.3
Interlocked system .................................................................... 21
7.4
Centralised control system ........................................................ 22
Installer and user reference guide
2
8 Configuration
8.1
Operating procedure .................................................................. 22
8.1.1
To change the settings with BRC1E53 ........................ 22
8.1.2
To change the settings with BRC301B61 .................... 23
8.2
List of settings ............................................................................ 24
3
8.3
Settings for all configurations ..................................................... 28
3
8.3.1
About setting 19(29)-0-04 and 19(29)-0-05 ................. 28
3
8.3.2
Independent system..................................................... 29
3
8.3.3
1-group linked-control system...................................... 29
3
8.3.4
Linked control with more than 2 groups ....................... 29
3
8.3.5
Direct duct connection ................................................. 30
4
8.3.6
Centralised control system........................................... 30
4
8.4
About the user interface ............................................................. 32
5
8.4.1
User interface for VRV-system air conditioner............. 32
5
8.4.2
User interface for heat reclaim ventilation units ........... 33
5
8.5
Detailed explanation of settings ................................................. 34
6
8.5.1
To monitor the unit's operation..................................... 34
6
8.5.2
About the fresh-up operation ....................................... 34
8.5.3
About the external damper operation........................... 35
8.5.4
About the carbon dioxide sensor ................................. 35
6
8.5.5
About the nighttime free cooling operation .................. 37
8.5.6
About the pre-cool and pre-heat function..................... 37
6
8.5.7
About preventing a feeling of draft ............................... 37
6
8.5.8
About 24-hour ventilation ............................................. 37
8.5.9
About the ultra-low setting ........................................... 37
7
7
8.5.10
About the electrical heater operation ........................... 38
8
8.5.11
About external linkage input......................................... 38
8.5.12
About filter contamination check .................................. 38
8
9 Commissioning
9
9.1
Overview: Commissioning.......................................................... 38
9
9
9.2
Precautions when commissioning .............................................. 38
9.3
Checklist before commissioning................................................. 38
9
9
9.4
Checklist during commissioning ................................................. 38
9
9.4.1
About the test run......................................................... 38
9
10 Hand-over to the user
10
11 Maintenance and service
11.1
Overview: Maintenance and service .......................................... 39
11.2
Maintenance safety precautions................................................. 39
11.2.1
To prevent electrical hazards....................................... 39
11.3
Checklist for maintenance of the heat reclaim ventilation unit ... 39
12 Troubleshooting
12.1
Overview: Troubleshooting......................................................... 39
12.2
Precautions when troubleshooting ............................................. 40
12.3
Solving problems based on error codes..................................... 40
12.3.1
Error codes: Overview ................................................. 40
13 Disposal
13
14 Technical data
14.1
Wiring diagram: Heat reclaim ventilation unit ............................. 40
For the user
15 User interface
16 Before operation
17 Energy saving and optimum operation
18 Maintenance and service
18.1
Maintenance of the air filter ........................................................ 42
20
18.2
Maintenance of the heat exchange element .............................. 43
19 Troubleshooting
20 Relocation
21 Disposal
22
38
39
39
39
40
40
41
41
41
41
42
43
43
43
VAM350~2000J7VEB
Heat reclaim ventilation unit
4P487293-1 – 2017.08

Advertisement

Table of Contents
loading

Table of Contents