To Install The Duct Joints - Daikin VAM350J7VEB Installer And User Reference Manual

Heat reclaim ventilation unit
Hide thumbs Also See for VAM350J7VEB:
Table of Contents

Advertisement

4 Guide the circuit board wire through the dedicated holes and
attach it as instructed in
page 16.
5 Attach the options to the unit, as shown in the figure.
6 After the wires are connected, fasten the switch box cover.
For model 650
a
d
f
a
BRP4A50A (optional accessory)
b
KRP2A51 (optional accessory)
c
KRP1BA101 (Fixing box)
d
EKMP65VAM (Mounting plate)
f
Screw
g
Screw (supplied with the fixing box)
1 Remove the screws from the unit.
2 Attach the optional mounting plate (EKMP65VAM) to the unit.
3 Attach the optional adapter printed circuit board (KRP2A51) in
the fixing box (KRP1BA101).
4 Follow the installation instructions provided with the option kits
(BRP4A50A, KRP2A51 and KRP1BA101).
5 Guide the circuit board wire through the dedicated holes and
attach it as instructed in
page 16.
6 Attach the options to the optional mounting plate, as shown in
the figure.
7 After the wires are connected, fasten the switch box cover.
For models 1500+2000
b
f
c
g
f
b + c
f
a
a
BRP4A50A (optional accessory)
b
KRP2A51 (optional accessory)
c
KRP1BA101 (Fixing box)
VAM350~2000J7VEB
Heat reclaim ventilation unit
4P487293-1 – 2017.08
"6.5.2  Opening the switch box"  on
b
c
f
g
f
"6.5.2  Opening the switch box"  on
e
e
EKMPVAM (Mounting plate)
f
Screw
g
Screw (supplied with the fixing box)
1 Remove the screws that are in the middle of the casing fixing
plate.
2 Attach the optional mounting plate (EKMPVAM) on top of the
casing fixing plate.
3 Attach the optional adapter printed circuit board (KRP2A51) in
the fixing box (KRP1BA101).
4 Follow the installation instructions provided with the option kits
(BRP4A50A, KRP2A51 and KRP1BA101).
5 Guide the circuit board wire through the dedicated holes and
attach it as instructed in
page 16.
6 Attach the options to the optional mounting plate, as shown in
the figure.
7 After the wires are connected, fasten the switch box cover.
5.3.2

To install the duct joints

1 Position the duct joints over the duct holes.
2 Secure the duct joints with the provided screws (accessories).
2
Models
Number of provided
screws
VAM350
VAM500
VAM650
VAM800
VAM1000
VAM1500
VAM2000
5.4
Preparing the electrical wiring
5.4.1
Wiring connection
WARNING
A main switch or other means for disconnection, having a
contact separation in all poles, MUST be incorporated in
the fixed wiring in accordance with the applicable
legislation.
You can use a single switch to supply power to units on the same
system. However, branch switches and branch circuit breakers
MUST be selected carefully.
Fit the power supply wiring of each unit with a switch and fuse as
shown in the drawing below.
5 Preparation
"6.5.2  Opening the switch box"  on
1
Number of provided
duct joints
16
4× Ø200 mm
16
4× Ø200 mm
24
4× Ø250 mm
24
4× Ø250 mm
24
4× Ø250 mm
48
8× Ø250 mm
48
8× Ø250 mm
Installer and user reference guide