Preparing The Installation Of The Ducts - Daikin VAM350J7VEB Installer And User Reference Manual

Heat reclaim ventilation unit
Hide thumbs Also See for VAM350J7VEB:
Table of Contents

Advertisement

▪ Use shielded cable for the transmission wiring. Ground the shield
of the shielded cable to
at the grounding screw, with the C-cup
washer.
5.5
Preparing the installation of the
ducts
INFORMATION
▪ Flexible ducting with sound insulation is effective to
reduce blowing noises.
▪ When you select installation materials, consider the
required volume of air flow and the acceptable level of
noise for that particular installation.
▪ When the return air infiltrates into the ceiling and the
temperature and humidity in the ceiling become too
high, insulate the metal parts of the unit.
▪ ONLY use the service hole to access the inside of the
unit.
▪ The sound pressure level is less than 70 dBA.
CAUTION
▪ For safety reasons, the required minimum length of the
ducting is 1.5  m. If the ducting is shorter, or if no
ducting is installed, then you MUST install grilles in the
duct openings or the openings of the unit.
▪ Make sure no wind can blow in the ducting.
VAM350~2000J7VEB
Heat reclaim ventilation unit
4P487293-1 – 2017.08
6
Installation
6.1
Service space: Heat reclaim
ventilation unit
>1000
a
>600
>50
a
Service space
6.2
Unit orientation
The following illustration helps you to install the heat reclaim
ventilation unit in the correct position:
6 Installation
150-250
(mm)
Installer and user reference guide
13

Advertisement

Table of Contents
loading

Table of Contents