Spring Tape Attachment - Brother PE770 Service Manual

Computerized sewing machine
Hide thumbs Also See for PE770:
Table of Contents

Advertisement

Main unit
1

Spring tape attachment

1. Attach the spring tape 1 to the thread guard assembly 2.
*Key point
• See the figure to the right for positioning.
2
Thread guide wire attachment
1. Attach the thread guide wire 1 and the washer 2 using the screw 1.
*Key point
• While holding the thread guide wire 1 up, tighten the screw
1.
1
3 - 16
Thread tension mechanism
Screw, Pan (S/P washer)
M3X6
1
Torque
0.78 — 1.18 N·m
0 — 0.5
2
1
1
2

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dz820eSb7900eNv770eNv750ePe780d

Table of Contents