Embroidery
16
X tension pulley assembly removal
1. Remove the 2 screws 1, and then remove the timing belt 1 and the X
tension pulley assembly 2.
17
X tension pulley ASSY disassembly
1. Remove the retaining ring (E4), and then remove the tension pulley 2
from the X tension pulley assembly 1.
18
X driving gear pulley removal
1. Remove the retaining ring (E4), and then remove the X driving gear pulley
1 and the washer 2.
2 - 60
Embroidery parts
1
2
1
1
Retaining ring E4
2
1
Retaining ring E4
2