GENERAL

When installing, operating and maintaining your
Erin Stove respect basic standards of fire safety.
Read these instructions carefully before commenc-
ing the installation. Failure to do so may result in
damage to persons and property. Consult your local
Municipal office and your insurance representative
to determine what regulations are in force. Save
these instructions for future reference.
Please note that it is a legal requirement under
England & Wales Building Regulations that the
installation of the stove is either carried out under
Local Authority Building Control approval or is
installed by a Competent Person registered with a
Government
approved
Scheme. HETAS Ltd operate such a scheme and a
listing of their Registered Competent Persons can
be found on their website at www.hetas.co.uk.
Special care must be taken when installing the stove
such that the requirements of the Health & Safety at
Work Act are met.
Handling
Adequate facilities must be available for loading,
unloading and site handling.
Fire Cement
Some types of fire cement are caustic and should
not be allowed to come into contact with the skin. In
case of contact with the skin wash immediately with
plenty of water.
Asbestos
This stove contains no asbestos. If there is a possi-
bility of disturbing any asbestos in the course of
installation then please seek specialist guidance and
use appropriate protective equipment.
Metal Parts
When installing or servicing this stove care should
be taken to avoid the possibility of personal injury.
"IMPORTANT WARNING"
This stove must not be installed into a chimney that
serves any other heating appliance.
The complete installation must be done in accor-
dance with current Standards and Local Codes. It
should be noted that the requirements and these
publications may be superseded during the life of
this manual.
ERIN SOLID FUEL NON BOILER STOVE
INSTALLATION & OPERATING INSTRUCTIONS
Competent
Persons
Please refer to the current standards, BS EN 15287-
1:2007 Design, Installation and Commissioning of
chimneys. BS EN 14336:2004: Heating Systems in
Buildings. Installation & Commissioning of Water
Based Heating Systems.
Heating Systems in Buildings.
Based Heating Systems.
Heating Systems in Buildings. method for
calculation of the design heat load.

PRE INSTALLATION ASSEMBLY

Your Erin stove is supplied with the following items:
Legs
Ashtray
Top Spigot
Hob Filler Piece
Ashpan
Operating Tool
Tool Holder
Riddling Tool
Fire Fence
Touch-Up Paint (Enamel Only)
Secondary Air Con. Rod (packed under hob)
Glove
Fire Door Handle (Assembled) See fig. 1
Ashdoor Handle (Assembled) See fig. 1
Damper Assembly
Fig.1
(A).
After removing the stove from its pack, open
the ashpit door and remove the contents
from the ashpan. Attach the short timber
handle to the ashpit door using the M8 x
70mm long round head screw and the
spring washer. (See Fig.2).
Fig.2
6
BS EN 12828: 2003;
Design of Water
BS EN 12831: 2003;