GENERAL

When installing, operating and maintaining your
Oisin Stove respect basic standards of fire safety.
Read these instructions carefully before commenc-
ing the installation. Failure to do so may result in
damage to persons and property. Consult your local
Municipal office and your insurance representative
to determine what regulations are in force. Save
these instructions for future reference.
Please note that it is a legal requirement under
England & Wales Building Regulations that the
installation of the stove is either carried out under
Local Authority Building Control approval or is
installed by a Competent Person registered with a
Government
approved
Scheme. HETAS Ltd operate such a scheme and a
listing of their Registered Competent Persons can
be found on their website at www.hetas.co.uk.
Special care must be taken when installing the stove
such that the requirements of the Health & Safety at
Work Act are met.
Handling
Adequate facilities must be available for loading,
unloading and site handling.
Fire Cement
Some types of fire cement are caustic and should
not be allowed to come into contact with the skin. In
case of contact with the skin wash immediately with
plenty of water.
Asbestos
This stove contains no asbestos. If there is a possi-
bility of disturbing any asbestos in the course of
installation then please seek guidance and use
appropriate protective equipment.
Metal Parts
When installing or servicing this stove care should
be taken to avoid the possibility of personal injury.
"IMPORTANT WARNING"
This stove must not be installed into a chimney that
serves any other heating appliance.
The complete installation must be done in accor-
dance with current Standards and Local Codes. It
should be noted that the requirements and these
publications may be superseded during the life of
this manual.
THE OISIN SOLID FUEL NON BOILER STOVE
INSTALLATION & OPERATING INSTRUCTIONS
Competent
Persons
Please refer to the current standards, BS EN 15287-
1:2007 Design, Installation and Commissioning of
chimneys.

PRE-INSTALLATION ASSEMBLY

1.
After removing the stove from its packaging,
open the firedoor and remove all contents
from the ashpan.
2.
Fit the firedoor handle by screwing into the
fire door axle (see fig. 1).
3.
Remove the stove from the pallet and posi
tion it in the final installation position (see
location and clearance to combustibles sec
tion).
Your Oisin stove is supplied with the following items:
Timber Handle (Black, Majolica & Seno)
Black Spring Handle Assembly (Cream & 
French Grey)
Glove (Cream & French Grey only)
Ashpan
Operating Tool
Touch-Up Paint (Enamel Only)
Installation & Operating Manual
Fig.1
Wooden Handle
Spring Handle
Rnd Hd Screw
Components for
Wooden Handle

FLUES

Flues should be vertical wherever possible and
where a bend is necessary, it should not make an
angle of more than 45
flue runs should be avoided except in the case of a
back outlet from the appliance, when the length of
the horizontal section should not exceed 150mm.
7
Nylon Cap Washer
Spindle
Spring Handle
Increasing Collar
End Cap
Components for
Spring Handle
o
with the vertical. Horizontal