Final Steps; Tightening Of Screws; Cable Clamps, Earthing Bar And Emc Clips; Figure 47: Cable Clamps And Earthing Bars (Conductive Foam In Bars And Clamps Is Dark Shaded) - ABB FOX615 Installation & User Manual

Table of Contents

Advertisement

3.9

Final steps

3.9.1

Tightening of screws

3.9.2

Cable clamps, earthing bar and EMC clips

FOX615
Installation
The FOX subrack equipment is now completely installed in the rack. If
required, the individual subracks can be readjusted for their final in position
in the rack.
If all equipment is in its final position the M6 screws must be tightened defini-
tively. For recommended torques, refer to section
The subrack of the FOX615 subrack provides a left side and a right side
cable clamp and earthing bar. Each bar has its own clamp, each of which is
independent from the other.
Figure 47: Cable clamps and earthing bars (conductive foam in bars
and clamps is dark shaded)
The steps to remove the right side cable clamp from its earthing bar are as
follows:
I N S T A L L A T I O N P R O C E D U R E S
Torques
16
15
21
13
A
(on page 34).
14
22
11
12
73

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents