Commissioning, inspection, maintenance
Steps - commissioning, inspection and...
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
6
Commissioning steps
Inspection steps
Maintenance steps
21. Checking the ignition and ionisation electrodes......... 24
23. Cleaning the burner........................................................ 25
to 311 kW)........................................................................ 27
26. Checking and replacing (if required) the filter
elements in the gas supply pipe.
27. Checking all gas connections for tightness................ 27
31. Checking the function of safety valves
32. Checking the diaphragm expansion vessel and
system pressure............................................................. 31
34. Checking the thermal insulation for tight fit
35. Checking the ventilation apertures in the installation
room (only for open flue operation)
36. Instructing the system user........................................... 32
37. Operating and service documents................................ 32
(cont.)
Page