Stack Installation - Planet WGSW-2403 User Manual

24-port + 3-slot stackable ethernet switch
Table of Contents

Advertisement

3.
Push the module gently into the slot along the slide tracks.
4.
Ensuring that it firmly engages with the connector then tighten the screws to secure
the module.
CAUTION: The slide-in slots are not hot swappable, power off the switch before installing
modules.

2.4 Stack Installation

There are two RJ-45 ports on the front panel for proprietary management stack. Only
straight-through UTP/STP cable can be used.
Plug one end of the cable in the "IN" port and the other end to the "OUT" port of next
device. Repeat the step for every device in the stack cluster, then ending at last switch.
NOTE:Before management stacking, be sure of every device uses a unique "SWITCH
ID", or the management stack will not work. The switch with least SWITCH ID
will become Master.
telnet, web and SNMP) is accessible.
Please find the following picture for sample connection. Please note the stack port is for
management only. For data packets to be transmitted between switches, you will still
need to connect their network ports.
Only Master switch's management interface (console,
- 10 -

Advertisement

Table of Contents
loading

Table of Contents