Startup And Operation; Starting The Fb100 - Emerson FloBoss 103 Instruction Manual

Hide thumbs Also See for FloBoss 103:
Table of Contents

Advertisement

2.4 Startup and Operation

Caution
2.4.1
Revised August-2017
10.
Remove the two dowel pins. In their place, install two 5/16-18 x 7/8
long bolts and lock washers. Securely tighten all cap screws
attaching the FB104 to the meter.
Once you install the Pulse Interface module to the meter, the pressure
transducers are attached to the process. See Making Process
Connections in Chapter 7.
Before starting the FB100, perform the following checks to ensure the
unit is properly installed.
▪ Check the field wiring for proper installation (refer to Chapters 3
and 4).
▪ Make sure the input power has the correct polarity.
▪ Make sure the input power is fused at the power source. Plug the
input power into the connector labeled CHG+ / CHG-.
When installing equipment in a hazardous area, ensure that all
components are approved for use in such areas. Check the product
labels. Change components only in an area known to be non-hazardous.
Performing these procedures in a hazardous area could result in
personal injury or property damage.

Starting the FB100

The FB100 ships with the reset jumper (located immediately below the
LCD) in the OFF position to prevent unnecessary battery drainage.
To apply power to the FB100:
Unscrew the front end cap cover on the LCD end.
1.
2.
Place the power jumper (located on the LCD if installed or located
at J1 on the Battery Charger module) in the ON position (see Figure
2-9).
FloBoss 103/104 Instruction Manual
Installation and Use
2-11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Floboss 104

Table of Contents