Fortinet FortiAnalyzer-2000B Rack And Hardware Install Manual page 16

Reports analyze logs for email, ftp, web browsing, security events, and other network activity
Table of Contents

Advertisement

Cable Management Arm Installation
14
Figure 8: Cable Management Arm kit contents
Note: To secure the CMA for shipment in the rack, loop the tie wraps around both baskets
and tray and cinch them firmly. For larger CMAs, the tie wraps can be threaded through the
inner and outer baskets and around the tray to secure them. Securing the CMA in this
manner will also secure your system in unstable environments.
2 To install or remove the Cable Management Arm Tray, do the following:
Note: The CMA tray provides support and acts as a retainer for the CMA.
Align and engage each side of the tray with the receiver brackets on the inner
edges of the rails and push forward until the tray clicks into place (4).
2
FortiAnalyzer-2000B Version 4.0 MR1 Rack and Hardware Install Guide
Rack Installation Instructions
1
3
Revision 1
http://docs.fortinet.com/
Feedback

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents