Planet IGS-5225-16T4S User Manual page 36

Industrial l2+ gigabit ethernet managed switch igs-5225 series
Hide thumbs Also See for IGS-5225-16T4S:
Table of Contents

Advertisement

3.
There are two Digital Input groups for you to monitor two different devices. The following topology shows how to wire DI0
and DI1.
4.
There are two Digital Output groups for you to sense Industrial Managed Switch port failure or power failure and issue a
high or low signal to external device. The following topology shows how to wire DO0 and DO1.
Figure 2-18 Wires DI0 and DI1 to Open Detector
Figure 2-19 Wiring DO0 and DO1 to Open Detector
36
User's Manual of IGS-5225 series

Advertisement

Table of Contents
loading

This manual is also suitable for:

Igs-5225-24p4sIgs-5225-20t4c2x

Table of Contents