Installing the Hardware

Items Required

Grounding wrist strap
Phillips screwdriver
Flat-blade screwdriver

Site Preparation

Environmental Requirements

OmniSwitch 6350 switches have the following environmental and airflow requirements:
The installation site must maintain a temperature between 0° and 45° Celsius (32° and 113° Fahrenheit)
and not exceed 95 percent maximum humidity (non-condensing) at any time.
Be sure to allow adequate room for proper air ventilation at the front, back, and sides of the switch.
Refer to
"Airflow Considerations" on page 2-5
necessary at the top or bottom of the chassis.

Electrical Requirements

Note. Alcatel-Lucent switches must be installed by a professional installer. It is the responsibility of the
installer to ensure that proper grounding is available and that the installation meets applicable local and
national electrical codes.
OmniSwitch 6350 Hardware Users Guide
2 Getting Started
for minimum clearance requirements. No clearance is
April 2017
page 2-1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents