Table Of Contents; Job Specification Sheet - Pentair FLECK 5600 Service Manual

Hide thumbs Also See for FLECK 5600:
Table of Contents

Advertisement

TABLE OF CONTENTS

JOB SPECIFICATION SHEET ...............................................2
INSTALLATION .....................................................................3
START-UP INSTRUCTIONS..................................................4
START-UP PROCEDURES ....................................................4
START-UP PROCEDURES ....................................................5
START-UP PROCEDURES ....................................................6
WATER CONDITIONER FLOW DIAGRAMS ...........................7
5600 ELECTROMECHANCIAL ............................................ 16
5600 VALVE ACCESSORIES ............................................... 17
5600 VALVE ASSEMBLIES ................................................. 18
SERVICE INSTRUCTIONS .................................................. 21
TROUBLESHOOTING .......................................................... 24
MODEL 5600SF TROUBLESHOOTING ............................... 25
CALIFORNIA PROPOSITION 65 WARNING
This product contains chemicals known to
WARNING:
the State of California to cause cancer or
birth defects or other reproductive harm.
2 • FLECK
5600 Service Manual

JOB SPECIFICATION SHEET

Job Number: ______________________________________________
Model Number: ____________________________________________
Water Hardness: __________________________________ ppm or gpg
Capacity Per Unit: __________________________________________
Mineral Tank Size: ___________ Diameter: ________Height: ________
Salt Setting per Regeneration: ________________________________
1. Type of Timer:
A. Time Clock
B. Meter Initiated
2. Downflow:
Upflow
3. Meter Size:
A. 3/4-inch Turbine
B. 3/4-inch Paddle Wheel
C. Electronic ____Pulse Count ___ Meter Size ____________
4. System Type:
A. System #4: 1 Tank, 1 Meter, Immediate, or
Delayed Regeneration
B. System #4: Time Clock
5. Timer Program Settings:
A. Backwash: ______________________________ Minutes
B. Brine and Slow Rinse:_____________________ Minutes
C. Rapid Rinse: ____________________________ Minutes
D. Brine Tank Refill: ________________________ Minutes
E. Pause Time: ____________________________ Minutes
F. Second Backwash: _______________________ Minutes
6. Drain Line Flow Control:
7. Brine Line Flow Controller:
8. Injector Size#:
Upflow Variable
gpm
gpm

Advertisement

Table of Contents
loading

Table of Contents