Download Print this page

Kohler K-301 Installation Manual page 7

3/4 inch high-flow deck/rim mount bath valve
Hide thumbs Also See for K-301:

Advertisement

Available languages

Available languages

2-3/8" (6 cm) Copper
Tube (Finished Deck
or Bath Rim
Installation Only)
1/2"
Rubber
Tee
Washer
Fiber
Washer
2-7/8" (7.3 cm)
Copper Tubes
Mounting
Valve Body
Nut
3. Install the Valves
IMPORTANT! Do not solder the connections during this step.
Thread one mounting nut, flange side up, followed by one fiber
washer and one rubber washers onto each valve body.
Insert the 2-7/8" (7.3 cm) long copper tubes between the valve
bodies and 1/2" tee.
For a finished deck or bath rim installation only, insert the 2-3/8"
(6 cm) long copper tube into the top of the tee.
NOTE: Orient the valve body marked "COLD" so it is on the right
when facing the front of the faucet.
Insert the valve bodies through the mounting holes from the
bottom of the deck/rim.
Hold the tube in place.
Place a collar, flange side up, on each valve body and thread
them down to at least 1-13/16" (4.6 cm) from the top of the valve
stem.
Kohler Co.
Valve Stem
7
1-13/16"
(4.6 cm)
Collar
113969-2-AC

Advertisement

loading