Time Programs; Switching Points; Standard Program; Holidays - Siemens Albatros2 RVS46 User Manual

Zone controler
Hide thumbs Also See for Albatros2 RVS46:
Table of Contents

Advertisement

Entering the switching
times

Switching points

Standard program

Siemens Schweiz AG
HVAC Products

6.4 Time programs

For the heating circuits and DHW heating, a number of switching programs are
available. They are activated in "Automatic" operation and control the change of the
temperature levels (and the associated setpoints) via the selected switching times.
The switching times can be set in a combined way, that is, either commonly for several
days or in the form of separate times for individual days. When preselecting groups of
days like for instance Mo...Fr and Sa...Su that use the same switching times, setting of
the switching programs is simplified.
Line no.
HC1
HC2
3/HCP 4/DHW
500
520
540
560
501
521
541
561
502
522
542
562
503
523
543
563
504
524
544
564
505
525
545
565
506
526
546
566
Line no.
516, 536, 556, 576
All time programs can be reset to their default settings. Each time program has its own
operating line to make the reset.
In that case, individual settings will be lost!

6.5 Holidays

Line no.
HC1
HC2
HCP
641
651
661
642
652
662
643
653
663
648
658
668
The holiday program is used to switch the heating circuits to a selectable operating
level according to calendar dates.
• The holiday program can only be used in "Automatic" operation
User Manual
The settings in detail
Operating line
Preselection
Mo - Su
Mo - Fr
Sa - Su
Mo - Su
1st phase on
1st phase off
2st phase on
2st phase off
3st phase on
3st phase off
Operating line
Default values
Operating line
Preselection
Start
End
Operating level
Frost protection
Reduced
55/100
CE1U2353en
22. November 2006

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents