Step
2
Install (or verify correct installation of) enclosures for HC900
Controllers and ancillary equipment:
Mounting rails or flat-panels
(for cabinet with multiple HC900 Chassis):
Master control Relay
Install (or verify correct installation of) enclosures ("closets")
3
for networking devices:
4
Install (or verify correct installation of):
External disconnect switches
Fuses
at the power source associated with input sensor or output
devices for I/O modules.
Arrange and organize items to be installed at or near
5
enclosures.
Revision 6
21 April 2017
Procedure
grounding bus
barrier strip for AC power
HC900 Process & Safety Controller User and Installation Manual
Reference
Mount Racks
Table 8 – Mount Rack
See Pre-installation planning
sections.
Note:Some networking devices
may share enclosures with
HC900 Controller components.
See I/O Module Installation
and Wiring on page 77.
67