Diagram Of Connecting ,,Stropuva" Boiler To Other Boiler, Water Heater, Radiators - Stropuva S7 Technical Passport Installation And Maintenance Instructions

Solid fuel boiler for central heating
Table of Contents

Advertisement

6.4 diagram of connecting ,,Stropuva" boiler to other boiler,
1. Triple D25
2. Triple D25 x D15
3. Elbow D25 V/V
4. Elbow D25 V/i
5. Nipple D25
6. Adapter D25 x D15
7. Circulation pump installation kit D25
8. Separable connection D25 V/i
9. Automatic bleeding device
10. Balance valve D25 V/i
11. Horizontal monometer 1/4"
12. Adapter D15 x 1/4"
13. Ball valve V/i 1"
For boilers S7, S10, S20, S7 BIO, S10 BIO, S20 BIO and S10U, S20U, nodes are assembled
from parts D20. For boilers S40, S40 BIO and S40U node is assembled from parts D25.
16
TECHNICAL PASSPORT INSTALLATION AND MAINTENANCE INSTRUCTIONS
water heater, radiators
- 11 pcs.
14. Circulation pump
- 3 pcs.
15. Thermostat head 20 - 50
- 2 pcs.
16. Valve three directional for fl ow distribution
- 2 pcs.
17. Threaded tip DN2 25
- 15 pcs.
18. Valve for fi lling i/i 1/2"
- 3 pcs.
19. Valve for release 1/2
- 1 pcs.
20. Disc valve made from brass V/V 1"
- 2 pcs.
21. Adapter D32 x D25
- 1 pcs.
23. Valve 1,5 bar
- 1 pcs.
B - to/out of water tank
- 1 pcs.
K2 - to/out of other boilers
- 1 pcs.
R - to/out of radiator
- 4 pcs.
Figure 11
C
0
- 1 pcs.
- 1 pcs.
- 1 pcs.
- 3 pcs.
- 1 pcs.
- 1 pcs.
- 1 pcs.
- 2 pcs.
- 1 pcs.

Advertisement

Table of Contents
loading

Table of Contents