**Power of boiler is selected according to heated space. For example if in Stropuva S20
solid fuel boiler built in 200m
Stropuva S40 solid fuel boiler burns almost for 48 hours (35-40 hours). Solid fuel boiler Stropuva
S10 could be used, but warming up of building would take longer and fuel load would need to
be added 2-3 times in 24 hours.
***Duration of burn of one load depends on the quality of fuel, inside and outside temperature,
thermal resistance, boiler power, adherence to recommendations of user manual (boiler
installation, fl ow of heated water, maintenance of water temperature).
pav.1
pav.1
Figure 1
ATENTTION!
TECHNICAL PASSPORT INSTALLATION AND MAINTENANCE INSTRUCTIONS
building one fuel load burns 24 hours than one load of fi rewood in
2

2. STRUCTURE OF BOILER

It is forbidden to change the construction of boiler.
1. Air valve
2. Draft regulator
3. Support rod
4. Air heating chamber
5. Smoke removal opening
6. Switch valve
7. Telescopic pipe of air injection
8. Door for loading of fuel
9. Air distributor with combustion chamber
stabilizer
10. Fuel
11. Door for ash removal
12. Lifting cord with ring
13. Hook
14. Pipe of hot water
15. Pipe of return water
16. Socket for thermometer
17. Socket for pressure safety valve 1,5 bar
18. Bottom
19. Fire grate
20. Defl ectors
21. Air injection collector
5