Heatilator CRAVE4836-B Installation And Appliance Setup page 42

Hide thumbs Also See for CRAVE4836-B:
Table of Contents

Advertisement

Install Horizontal Termination Cap
WARNING! Risk of Fire! The telescoping flue section of
the termination cap MUST be used when connecting vent.
• 1-1/2 (38 mm) minimum overlap of flue telescoping
section is required.
Failure to maintain overlap could cause overheating
and fire.
• Vent termination must not be recessed in the wall. Siding
may be brought to the edge of the cap base.
• Flash and seal as appropriate for siding material at
outside edges of cap.
• When installing a horizontal termination cap, follow
the cap location guidelines as prescribed by current
ANSI Z223.1 and CAN/CGA-B149 installation codes
and refer to Section 6 of this manual.
CAUTION! Risk of Burns! Local codes may require in-
stallation of a cap shield to prevent anything or anyone
from touching the hot cap.
NOTICE: For certain exposures which require superior
resistance to wind-driven rain penetration, a flashing kit
and HRC caps are available. When penetrating a brick
wall, a brick extension kit is available for framing the brick.
Note: When using termination caps with factory-supplied
heat shield attached, no additional wall shield firestop is
required on the exterior side of a combustible wall.
HEAT SHIELD OR
EXTENDED
HEAT SHIELD
WALL SHIELD
FIRESTOP
SLIP SECTION
CAN BE EXTENDED
INNER VENT
OUTER VENT
Figure 7.15 Venting Through the Wall
Heatilator • CRAVE4836/ST-B, CRAVE6048/ST-B, CRAVE7260/ST-B, CRAVE8472/ST-B Installation Manual • 2301-973 Rev. H • 5/17
42
HEAT SHIELD
1-1/2 IN. (38 MM) MIN.
OVERLAP
SHEATHING
INTERIOR
EXTERIOR

Advertisement

Table of Contents
loading

Table of Contents