Test Operation And Lighting Sequence; Installation Checklist And Customer Handover - Rinnai RDV600N Installation Manual

Ember series
Hide thumbs Also See for RDV600N:
Table of Contents

Advertisement

Test operation and lighting sequence

It may take approximately two hours of operation for the burn media to achieve their full
flame pattern and glow. During the initial burning in period, some smoke and smell may
be experienced. The appliance should run on the high setting in a well ventilated room
until these dissipate. It is important to check the flame pattern during this time.
Abnormal flame pattern
Abnormal flame performance and/or pattern can
indicate a problem with your fire, such as blocked
gas injectors, or that the burn media has shifted.
There are some warning signs that could indicate
a problem.
-
Unusual smell from the appliance
-
Continued difficulty or delay in establishing a
flame
-
Flame appears either very short or very long
-
Flame only burns part way across the burner
-
Severe soot building up on the inside of the
glass door
Important
It is the responsibility of the installer to check that
under normal conditions of the appliance, all flue
gases are exhausted to the outside atmosphere,
and that there is no spillage of combustion gases
into the room.
If the appliance cannot be made to perform
correctly please contact Rinnai.

Installation checklist and customer handover

Complete the installation checklist in the customer operation guide, and
make sure you leave the guide with the customer. Add a touch of magic
by taking the time to explain to the customer about the use and care of
the unit, and that they understand the instructions.
28 ¦ Ember Installation Guide: 12890-A 01-17
Normal flame pattern
Abnormal flame pattern

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rdv600lRdv700nRdv700l

Table of Contents