Verifying The Installation - HP FlexFabric 12500E Installation Manual

Routing switch
Table of Contents

Advertisement

Figure 33 Installing the protection cover
1

Verifying the installation

WARNING!
A 12508E has one power switch, and a 12518E has two power switches. Make sure you have turned off
the power before checking the installation to avoid bodily injury and switch damage.
After the installation is completed, verify the installation against the following list. Be sure that all check
results are positive.
Table 8 Installation checklist
Item
The grounding cable is correctly grounded.
Fan trays are correctly installed and make close contact
with the backplane.
Power modules are correctly installed and have close
contact with the frames.
The power switch is off (the power switch is at the OFF
position).
Power cords are correctly connected.
MPUs are correctly installed and have close contact with
the backplane.
LPUs are correctly installed and have close contact with
the backplane.
Switching fabric modules are correctly installed and have
close contact with the backplane.
2
3
2
4
1
Result
Yes
36
4
Remarks
No

Advertisement

Table of Contents
loading

Table of Contents