Verifying the installation

After you complete the installation, verify that:
There is enough space for heat dissipation around the router, and the rack or workbench is stable.
USB devices and interface modules are properly installed.
The router, rack, and power cords are properly grounded.
The correct power source is used.

Powering on the router

Verifying before power-on

Before powering on the router, verify the following items:
The power modules are correctly installed.
The power cord and grounding cable are properly connected.
The power source voltage meets the requirement of the router.
The console cable is properly connected, the terminal or PC used for configuration has started, and
the configuration parameters have been set.
If a CF card is used, verify that the CF card is in position.
Make sure the installed HMIMs/MIMs are in position.

Powering on the router

Turn on the switch of the power supply system for the router.
1.
Turn on the switch of the AC or DC power modules.
2.
xxix