(3) Remove the paper pick-up roller shaft and the first feed roller shaft from the front chute
ASSY.
(4) Remove the four bind B M4x10 Taptite screws to remove the front chute ASSY.
PE actuator
Taptite, bind B M4x10
(5) Turn the front chute ASSY upside-down, and then remove the bearing 5 and the joint 5 to
remove the first feed roller from the front chute ASSY.
First feed roller
Joint 5
CHAPTER 4 DISASSEMBLY AND RE-ASSEMBLY
CA actuator
Taptite, bind B M4x10
Paper pick-up roller shaft
Front chute ASSY
Fig. 4-94
(hook)
Bearing 5
Front chute ASSY
Fig. 4-95
4-63
First feed roller shaft