Installing A Smart Storage Battery - HP ProLiant DL60 Gen9 User Manual

Hide thumbs Also See for ProLiant DL60 Gen9:
Table of Contents

Advertisement

Install the access panel (on page 19).
13.
Do one of the following:
14.
Slide the server into the rack.
o
Install the server into the rack.
o
Power up the server (on page 15).
15.
If you are planning to install new drives, install them now.
16.
For more information about the integrated storage controller and its features, select the relevant user
documentation on the Hewlett Packard Enterprise website
(http://www.hpe.com/info/smartstorage/docs).
To configure arrays, see the HPE Smart Storage Administrator User Guide on the Hewlett Packard
Enterprise website (http://www.hpe.com/info/smartstorage/docs).

Installing a Smart Storage Battery

For more information about product features, specifications, options, configurations, and compatibility,
see the product QuickSpecs on the Hewlett Packard Enterprise website (http://www.hpe.com/info/qs).
CAUTION: In systems that use external data storage, be sure that the server is the first unit
to be powered down and the last to be powered back up. Taking this precaution ensures that
the system does not erroneously mark the external drives as failed when the server is powered
up.
To install the component:
Power down the server (on page 15).
1.
Remove all power:
2.
Disconnect each power cord from the power source.
a.
Disconnect each power cord from the server.
b.
Do one of the following:
3.
Extend the server from the rack (on page 15).
o
Remove the server from the rack (on page 18).
o
Remove the access panel (on page 18).
4.
Install the Smart Storage Battery:
5.
Hardware options installation 42