1. Out-of-Box Audit

Shipping List

Before opening the box, make sure the packaging is not damaged or wet. Take care to
avoid potential damage to the base station by handling the package gently.
The shipping list is shown in Table 1-1. After unpacking the base station, ensure that the
items and their quantity are consistent with the shipping list.
Number
Item
1
Base station
2
Power supply
3
Mounting bracket
on pole
4
Omega
5
Mounting bracket
on wall
6
Installation
accessories
7
OT terminal
8
Hydraulic terminal
9
Waterproof daub
10
Ultraviolet-proof
tape
11
Ultraviolet-proof tie
12
Factory inspection
list
13
Certification
14
User guide
15
Shipping list
Note:
If the outer package is damaged or wet report the issue to the vendor. If any items are missing or damaged
report to the local vendor within 10 days.
Table 1-1 Shipping List
Quantity
Check the device's tag to see if it is
1
consistent with the requirement
1
100V~277V AC to -48V DC adaptor
2
Fixed accessories
4
Fixed accessories
3
Fixed accessories
-
M10*160 outer hex bolts: 4
M10 nut: 9
M10 ball pat:9
M10 flat mat: 9
M6*16 inner hex screw kit:11
M10 expansion bolt: 3
1
-
1
-
2
-
1
-
1
-
1
-
1
-
1
-
1