2. Installation Preparation

Supporting Materials

Prepare following supporting materials, given in Table 2-1.
Table 2-1 Supporting Materials for Base Station Installation
Name
Power line
Antenna feeder
Ethernet Cable
Antenna
Ground wire
GPS

Installation Tools

The following tools are needed during the installation.
Level bar
Percussion drill and
some drill heads
5mm L-shape allen
wrench
< AWG16,e.g., AWG14
Shorter than 1150 feet
50 ohm feeder
Outdoor CAT6
Omnidirectional, or directional antenna
16mm² yellow/green wire
GPS antenna, N type cable, and GPS mounting bracket
Marking pen
hammer
Cross
screwdriver
Water-proof
Insulating tape
tape
5
Description
Knife
Vise
Cable vise
Ladder
Wrench
Tape measure