Download Print this page

Start-Up; General; Preparation; Procedure - Dimplex HWK 332 Econ Installation And Operating Instructions Manual

Hydro tower with hpm

Advertisement

Available languages

Available languages

7

Start-up

7.1 General

To ensure that start-up is performed correctly, it should only be
carried out by an after-sales service technician authorised by the
manufacturer. This may be a condition for extending the guaran-
tee (see "Warranty service").

7.2 Preparation

The following items need to be checked prior to start-up:
All of the hydro tower connections must be installed as de-
scribed in chapter 6.
All valves that could impair the proper flow of the heating
water in the heating circuit must be open.
The settings of the heat pump manager must be adapted to
the heating system in accordance with the latter's operating
instructions.

7.3 Procedure

The hydro tower is started up via the heat pump manager. Set-
tings should be made in compliance with the instructions.
The operating overpressures indicated on the type plate must not
be exceeded.
Any faults which occur during operation are also displayed on the
heat pump manager. They can be rectified as described in the
operating instructions.
8

Cleaning / maintenance

8.1 Maintenance

To protect the cover, avoid leaning anything against the device or
putting objects on the device. External parts can be wiped clean
with a damp cloth and domestic cleaner.
ATTENTION!
Never use cleaning agents containing sand, soda, acid or chloride, as
these can damage the surfaces.

8.2 Cleaning the heating system

The ingress of oxygen into the heating water circuit may result in
the formation of oxidation products (rust), particularly if steel
components are used. These enter the heating system via the
valves, the circulating pumps and/or plastic pipes. A diffusion-re-
sistant installation is therefore essential, especially with regard to
the piping of underfloor heating systems.
Residue from lubricants and sealants may also contaminate the
heating water.
In the event of severe contamination leading to a reduction in the
performance of the liquefier in the heat pump, the system must
be cleaned by a heating technician.
Based on current information, we recommend using a 5% phos-
phoric acid solution for cleaning purposes. However, if cleaning
needs to be performed more frequently, a 5% formic acid solu-
tion should be used.
In either case, the cleaning fluid should be at room temperature.
We recommend flushing the heat exchanger in the direction op-
posite to the normal flow direction.
To prevent acidic cleaning agents from entering the heating sys-
tem circuit, we recommend connecting the flushing device di-
rectly to the flow and return of the liquefier of the heat pump.
It is then important that the system be thoroughly flushed using
appropriate neutralising agents to prevent any damage from
being caused by cleaning agent residue remaining in the system.
Acids must be used with care, and the regulations of the employ-
ers' liability insurance associations adhered to.
In case of doubt, consult the manufacturer of the cleaning agent!

8.3 Corrosion Protection Anode

The corrosion protection anode installed in the hot water cylinder
should be electrically checked on a regular basis, at least every
two years after start-up, and be replaced if necessary. Electrical
checking is carried out by means of a suitable ammeter, without
draining the tank.
Procedure:
1)
Unplug PE cable from protection anode tab.
2)
Connect ammeter (0...50mA) between PE cable and tab.
3)
Evaluation of protection anode wear:
Measured value > 1 mA ⇒ protection anode is in working
order.
Measured value < 1 mA ⇒ protection anode must be tested
or replaced.
9

Faults / troubleshooting

This hydo tower is a quality product and designed for trouble-free
and maintenance-free operation. Should a fault occur, however,
it will be indicated on the heat pump manager display. In this
case, consult the "Faults and troubleshooting" page in the oper-
ating instructions of the heat pump manager. If you cannot cor-
rect the fault yourself, please contact your after-sales service
technician.
ATTENTION!
Work on the system must only be performed by authorised and qualified
after-sales service technicians.
10 Decommissioning /
disposal
Before removing the hydro tower, disconnect it from the power
source and close all valves. Observe all environmental require-
ments regarding the recovery, recycling and disposal of materi-
als and components in accordance with all applicable standards.
10
EN-5

Advertisement

loading

This manual is also suitable for:

Hwk 332