barbas Cuatro-2 60 Installation Instructions Manual page 29

Table of Contents

Advertisement

CUATRO-2 60
CUATRO-2 70
1
Handle
2
Ceramic heat-proof glass
3
Locking slider for operating pin of fl ue gas fl ap
4
Operating pin of fl ue gas fl ap
5
Smoke outlet (can be dismounted)
6
Convection air escape opening (permanent)
7
Convection air escape opening (2x)
The use of this is strongly recommended
For connecting convection set (option)
8
Internal panels (vermiculite plate) / Inner lining
9
Bottom (vermiculite plate) / Inner lining
10
Wood rack
11
Combustion air-supply slider (Combined operation for the primary and
secondary combustion air-supply)
12
Inlet opening convection air (2x on the side and 1x at the rear)
For a direct convection air supply possibility
The "break-away openings" should be removed.
Only applicable if the chimney is ventilated!
13
- Inlet opening combustion air from living-room. This automatically
becomes obsolete if the opening at the bottom is used (14)
- Intake opening convection air.
Only applicable is the detachable fl ap on the underneath is removed
and there is at least 1 cm free space (niche) below the appliance.
14
Inlet opening combustion air on underside of appliance. Optional use with
the connection ring supplied. For a direct combustion air supply possibility.
CUATRO-2 80
29

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cuatro-2 70Cuatro-2 80

Table of Contents