Control Of Modulating Burners - Siemens Synco700 RMK770 Documentation Handbook

Series modular boiler sequence controller
Table of Contents

Advertisement

Note
110/226
Building Technologies
HVAC Products
Owing to the performance of the temperature-time integral, it is not only the period of
time that is considered, but also the extent of overshoot. This means that when the
overshoot is significant, burner stage 2 will be locked earlier. When the reset integral
(area "b" in the diagram) has reached the set value of the reset integral of stage 2
(point in time t
), burner stage 2 will be locked and the basic stage switched off.
reset
TBo
TBoSp+
/
SDBo
1
2
TBoSp-
/
SDBo
1
2
BSt1
1
0
INT
max.
RlsINT
0
RlsBSt2
1
0
BSt2
1
0
BSt1
Burner stage 1
BSt2
Burner stage 2
INT
Integral
Rls
Release
Rst
Reset
SD
Switching differential
Sp
Setpoint
t
Time
TBo
Boiler temperature
If, with stages 1 and 2 released, both stages are locked at the same time, the basic
stage will be switched off with a delay of 10 seconds. Switching off in 2 phases also
reduces the pressure shocks in the gas supply line. This prevents unnecessary lockout
in the case of large burner capacities.
7.8.4

Control of modulating burners

Main menu > Commissioning > Settings > ... or
Main menu > Settings > Boiler ... > Burner modulating
Operating line
Actuator running time
P-band Xp
Integral action time Tn
Derivative action time Tv
Modulating burners operate in modulating mode only above a certain level (for normal
forced draft burners, this limit is about 30 to 40 % of the rated capacity).
Boiler Sequence Controller RMK770
7 Boiler temperature control
max.
RstINT
Range
1...600 s
1...200 K
0...600 s
0...30 s
t
t
RstINT
t
t
t
Factory setting
60 s
20 K
150 s
20 s
CE1P3132en
01.03.2005

Advertisement

Table of Contents
loading

Table of Contents