Overview Of Trial Operation Procedure - YASKAWA varispeed G7 CIMR-G7B series Instruction Manual

General purpose inverter (advanced vector control)
Table of Contents

Advertisement

Overview of Trial Operation Procedure

Perform trial operation according to the following flowchart.
Set power supply voltage. *1
Select
operating
(Quick programming mode)
method.
V/f
(Default: A1-02=0)
Set E1-03.
V/f default: 200V/50Hz(400V/50Hz)
Settings according
to control mode
50 m or heavy load possibly
(Advanced programming mode)
Optimum adjustments and
Check/record constants.
-2
4
START
Installation
Wiring
Turn ON power.
Confirm status.
Basic settings
Vector (A1-02=2, 3, or 4)
V/f control?
YES
V/f with PG
(A1-02=1)
PG?
Set E1-03, E2-04, and F1-01.
V/f default: 200V/50Hz
(400V/50Hz)
Motor cable over
YES
causing motor to stall or
overload?
NO
Stationary autotuning for
line-to-line resistance only
Application settings
*1 Set for 400 V Class Inverter for 55 kW or more.
No-load operation
*2 If there is a reduction gear between the motor and PG, set
Loaded operation
*3 Use rotational autotuning to increase autotuning accuracy
constant settings
*4 If the motor cable changes to 50 m or longer for the actual
END
*5 The default control mode is open-loop vector control 2
*6 If the maximum output frequency is different from the base
Fig 4.1 Trial Operation Flowchart
*5
*2
OK to operate
*3
motor during
autotuning?
YES
Rotational
*4
autotuning
the reduction ratio in F1-12 and F1-13 in advanced
programming mode.
whenever it is okay for the motor to be operated.
installation, perform stationary autotuning for the line-to-line
resistance only on-site.
(A1-02 =2).
frequency, set the maximum output frequency (E1-04)
after autotuning.
Load is
NO
connected to motor when
YES
operating motor first time
after autotuning?
NO
Stationary
Stationary
autotuning 1
*6
autotuning 2
*6

Hide quick links:

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents