Installation Procedure - Toshiba RAS-B10GKVP-E Service Manual

Hide thumbs Also See for RAS-B10GKVP-E:
Table of Contents

Advertisement

10-1. Safety Cautions
140 mm or more
5 Zeolite-plus filter
Air filters
2 Wireless
remote controller
100 mm or more
from wall
4 Remote controller holder
(Mounting holes on both
left and right sides)
8 Remote controller
holder mounting screw
When installing the outdoor unit,
leave open in at least two of
directions (A), (B), (C) and (D)
shown in the right figure.
Before installing the wireless remote controller
• With the remote controller cover
removed, correctly load the
supplied batteries while
observing their polarity.
Tel: 01823 665660
Heronhill - for all your Toshiba requirements

10. INSTALLATION PROCEDURE

Hook
Hook
6 Plasma pure filter
80 mm or more only
when unobstructed to
the front and both sides
50 mm or more
from wall
In principle,
leave open
(C)
200 mm
or more
(B)
Ensure sufficient space
to allow drainage
2 Wireless remote controller
www.heronhill.co.uk
47 mm or more
1 Installation plate
Hook
74 mm
or more
7 Mounting screw
Z Shield pipe
(for extension
drain hose)
Y
(D)
As shown in the figure, position power cord and
connecting cable downward, and lead out along
piping connection port.
(A)
250 mm or more
from wall
Power cord
Extension drain hose
(Option: RB-821SW)
Cover
3 Batteries
– 72 –
For the rear left and left piping
Wall
Insert the cushion between
the indoor unit and wall, and
tilt the indoor unit for better
installation work.
Do not allow the drain hose
to become slack.
Cut the piping
hole slightly
sloped
Make sure the drain hose is
sloped downward.
The auxiliary piping can be
connected at the left, rear left,
rear right, right, bottom right or
bottom left as shown below.
Right
Rear
Left
Bottom left
right
Bottom right
Rear left
Insulate the refrigerant pipes
separately, not together.
6 mm thick heat resisting
polyethylene foam
Fax: 01823 665807

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents