FINISHING COMMISSIONING
The boiler has been factory set, so there
should be no need to adjust combustion
settings.
REPLACE OUTER CASING:
Replace outer casing making sure that the
securing points are properly located .
... Press the clip (A) downwards to secure
casing on top .
... Retighten bottom two screws (B).
INSTALLING SOnOM PANEL:
2 The bottom panel slides onto two ledges
(C) either side of the boiler frame.
... Hold the panel up against the underside
of
the boiler and slide towards the rear until
it is fully engaged.
HANOOVER:
... Complete the Benchmark check list.
... Open the facia cover
by
gently pressing the
centre top of the cover
(0).
... Set up the controls and show the user how
to operate all the controls shown in the User
Guide.
... Place the user guide into the tray (E) on the
inside of the facia cover.
... If the appliance is unused and exposed to
freezing conditions; shut off all the mains
supplies and drain the system and boiler.
\
\
'\.
'"
I
I
;"
o
' .................. ___,.."..tIf'II""/
I
l
I
I
J
I
I
I
I
I
,.'
/
FINISHING COMMISSIONING
E
~ORCESTER
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER BOSCH GREEN.STAR 25CovaOCOV37COiI'2COi
6720 613
700a(2006/11)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Greenstar 30cdi gcGreenstar 37cdi gcGreenstar 42cdi gc

Table of Contents