above elbow
Using 1 00 mm flue kit
-1112mm
Using 125 mm flue kit
5mm
-1152 mm
600mm
, front clearance
, for service
SERVICING CLEARANCES
~_ ~
BOILER LOCATION &
+30rrm
, 200mm '
CLEARANCES
This boiler is only suitable for installing internally
within a property at a suitable location onto a
fixed, rigid non-combustible surface at least the
same size as the boiler and capable of support
ing the boiler weight.
COMPARTMENTS:
Follow the requirements of 886798 and
885440 Part 2 and note:
•
Minimum clearances must be maintained
• An
access door is required to install, service
and maintain the boiler and any anCillary
equipment.
• If fitting the boiler into an airing cupboard
use a non-combustible perforated material
(maximum hole sizes of 13mm) to separate
the boiler from the airing space.
BOILER CLEARANCES:
The diagram opposite shows the mini
space required to install and service the boiler.
VENTILATION
This is a room sealed appliance and does not
require any air for combustion from inside the
property. If the appliance is filted into a cup
board or a compartment is built around the
appliance after installation, then the compart
ment must be separated from the boiler space
by a perforated non-combustible partition as
described in 88 6798.
Notwithstanding the requirements of B8 6798
and B8 5440 there is no need for ventilation
openings to be provided in the compartment
because of the low heat loss from the appliance
casing, if the clearances shown are maintained.
Do not operate the appliance
if
the flue terminal
filted on the outside wall or roof is obstructed
or damaged.
~RCESTER
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER BOSCH GREENSTAR 25C0i/3OCOil37CDil42CDi
BOILER LOCATION
&
CLEARANCES
6720613700.(2006/11)