Sehing The Gas/Air Ratio - Worcester GREENSTAR 25CDi GC Instruction Manual

Wall hung rsf gas-fired condensing combination boiler
Hide thumbs Also See for GREENSTAR 25CDi GC:
Table of Contents

Advertisement

THE SETTING OF THE GAS RATIO MUST BE CARRIED OUT BY A COMPETENT PERSON
SETTING OF THE GAS RATIO MUST NOT BE ATTEMPTED UNLESS THE PERSON CARRYING OUT
THE CONVERSION IS EOUIPPED WITH A COMBUSTION ANALYSER CONFORMING TO BS 7927
AND IS COMPETENT IN ITS USE.
----------_
......
.,
I
I
,.-""'"­
,hll
I
I
, ,
r---:
I
,
,
\
\
... ...
. .
..............
"'''"
5 2
"
.
"
...
...
\
,
I
I
I
,
f
I
""""...;;:::;....-_1"'"
"
"
,
..
, ,
,
I
,
I
I
I
I
f
f
I
I
I
I
I
\
\
\
...
... ...
...
"
. .
......
.....
SETTING THE GAS/AIR RATIO
5. Setting the CO
2
Note: When running in the central heating
boost mode, the boiler will operate both the
central heating & DHW circuits. This is to allow
sufficient time for the setting procedure. It will
be necessary to run water through the DHW
circuit to ensure that the boiler will not cycle on
low heating demands.
5.1
~
Connect manometer to inlet pressure
point on the gas valve.
~
To adjust the CO 2 it will
be
necessary to
first operate the boiler at maximum output.
~
Press and hold down the central heating
boost button (A) for
10
seconds until iIIumi·
nated.
5.2~
Turn central heating control to maximum;
the boiler will then go to maximum output.
Note: The control will resume normal opera·
tion after
15
minutes or if the central heating
boost button is pressed for over a second.
5.3~
Using a flat blade screwdriver set the
C02 via adjuster
(8)
using table below.
Note: C02 should be measured 10 minutes
after firing the appliance.
Gas type
J
CO 2 . setting
J
C~~
setting
maximum
minimum
Greenstar 25CDi and 30CDi
Natural gas
I
9.6%
±O.2
I
9.0
%
±O.2
LPG
I
11.5 %
±O.2
I
10.5 %
±O.2
Greenstar 37CDi and 42CDi
Natural gas
I
9.7 %
±O.2
I
9.1 %
±O.2
LPG
J
11.5
%
±O.2
j
10.5 %
±O.2
~
Check CO is less than
200
ppm.
~
Measure the inlet pressure; it should
be
a
minimum of 18 mbar for natural gas and
37 mbar for LPG.
5.4~
Set the central heating control to mini·
mum. This will make the boiler go to mini·
mum power.
5.5~
Measure the CO 2 ; it should now be at
figure for minimum output. If not adjust (C)
on the gas valve until correct.
~
Return to maximum and re·check the
CO 2 , If correct press and hold down the
central heating boost button for 2 seconds;
the button will cease to be illuminated and
the blue power indicator will be permanently
illuminated.
~
Remove manometer and re-seal inlet pres·
sure point on gas valve.
~
Fit new plastic sealing cover on to outlet
adjuster (8).
~
Fit white cover over valve adjuster (C) and
secure with black security tag.
~
Remove red arrow from data plate and fit
new one in correct position for gas type.
~
Re·assemble and refit boiler case.
~
Re·connect mains electrical supply and
check boiler operation as stated in the com·
missioning section .
~
Fit new label from kit over existing label on
the appliance bottom panel.
INSTALLATION & SERVICING INSTRucnONS FOR WORCESTER BOSCH GREENSTAR 2SCOV30CDV37CDV42CO;
AORCESTER
SFTTINC::; THI= C::;AS/AIR RATln

Advertisement

Table of Contents
loading

This manual is also suitable for:

Greenstar 30cdi gcGreenstar 37cdi gcGreenstar 42cdi gc

Table of Contents