Finishing; Mantel And Wall Projections - Majestic MDVI30IN Installation Manual

Ruby series
Hide thumbs Also See for MDVI30IN:
Table of Contents

Advertisement

10
10

Finishing

A. Mantel and Wall Projections
WARNING! Risk of Fire! Comply with all minimum clear-
ances to combustibles as specifi ed. Framing or fi nishing
material closer than the minimums listed must be construct-
ed entirely of noncombustible materials (i.e., steel studs,
concrete board, etc).
Clearance to combustible material under the insert is 1/4
inch (6 mm). Clearance from top of fi replace opening for
combustibles extending 12 inches max. is 12 inches.
• Use leveling legs to raise insert minimum 1/4 inch (6 mm)
above combustible material or outer wrap of factory built
fi rebox.
Combustible facings must not extend behind the insert
surround. For non-combustible material specifi cations
refer to section 1.E.
EXISTING NON-COMBUSTIBLE FACING
Figure 10.1 Mantel Clearance
22
Majestic • MDVI30IN, MDVI35IN, MDVI30IL, MDVI35IL Installation Manual • 2205-980 Rev. H • 12/16
12 IN. MAX.
2 IN.
MAX.
12 IN. MIN.
10 IN. MIN.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mdvi35inMdvi35ilMdvi30il

Table of Contents