Cleaning Optical Devices; Checking The Installation; Verifying The Installation - Cisco ASR 9001 Hardware Installation Manual

Hide thumbs Also See for ASR 9001:
Table of Contents

Advertisement

Checking the Installation

instability in the laser system. Inspection, cleaning, and reinspection are critical steps to take before making
fiber-optic connections.

Cleaning Optical Devices

See the
optical devices.
Checking the Installation
This section describes the procedures you can use to verify the modular port adapter (MPA) installation, and
includes information on these topics:

Verifying the Installation

This section describes how to verify the modular port adapter (MPA) installation by observing the MPA LED
states.
When the system has reinitialized all interfaces, the MPA STATUS LEDs should be on (green). The port
LEDs (C/A and A/L) may be on (green), depending on your connections and configuration.
To verify that a MPA is installed correctly:
Procedure
Step 1
Observe the console display messages and verify that the system discovers the modular line card (MLC),
while the system reinitializes each interface, thus:
• As the MPA is initialized, the STATUS LED will first be amber, indicating that power is on. When the
Step 2
When the MPA STATUS LEDs are green, all associated interfaces are configurable.
• If a MPA is replaced with a module of the same type (as in an OIR or hardware swap), the previous
• If a MPA was not previously installed in the same slot or subslot, then the configuration for all associated
Note
Step 3
If the modular port adapters (MPAs) do not become active within three minutes, refer to the system console
messages. If there is no indication that a field-programmable device (FPD) upgrade is underway, see
Troubleshooting the Installation, on page 85
Cisco ASR 9001 and Cisco ASR 9001-S Routers Hardware Installation Guide
70
Inspection and Cleaning Procedures for Fiber-Optic Connections
modular port adapter card (MPA) is active, the STATUS LED will illuminate green.
configuration is reinstated when the MPA becomes active.
interfaces is empty.
New interfaces are not made available until you configure them.
Installing Modules and Cables in the Chassis
document for information on cleaning
section.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Asr 9001-s

Table of Contents