ParaBody 425104 Assembly Instructions Manual page 25

Parabody home gym assembly instructions
Table of Contents

Advertisement

94
93
26
FIGURE 28
STEP 28
• SECURELY assemble the BEARING HOUSING (6) and the CENTER PULLEY BRACKET (26) to the FRONT UPRIGHT (25) using two
1/2 X 4-1/2" BOLTS (89) , four 1/2" WASHERS (93), and two 1/2" LOCK NUTS (94). See FIGURE 28.
• Attach two 1 X 1" GUIDES (53) to the ANGLE on the UNDERSIDE of the BEARING HOUSING (6). See FIGURE 28.
FIGURE 29
1/2
0
93
25
84 3/8 X 2"
91
45
1/2
1/2
1
2
89 1/2 X 4-1/2"
STEP 29
• LOOSELY assemble two 3-1/2" PULLEYS (42) to the
CENTER PULLEY BRACKET (26) using two 3/8 X 2"
42
BOLTS (84), two 2-3/8" L-BRACKETS (45), four 3/8"
WASHERS (91), and two 3/8" LOCK NUTS (92). See
FIGURE 29.
(NOTE: This connection wil be tightened after the
26
cable has been routed.)
91
92
1/2
3
4
25
6
53
1/2
1/2
5
6

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Serious steel 425104

Table of Contents