Figure 20; E-Ring; Joint Connector Cap; Flat Washer - ParaBody 425104 Assembly Instructions Manual

Parabody home gym assembly instructions
Table of Contents

Advertisement

60
57
56

FIGURE 20

STEP 20
• Insert the PUSH/PULL CABLE through the bottom of the PRESS ARM (27) up to the CONTROL LEVER (60) and hold in place with
one E-RING (56) as shown in FIGURE 20.
• SECURELY assemble the PUSH/PULL CABLE to the CONTROL LEVER (60) using one 3/8" JOINT CONNECTOR CAP (57),
two #10 FLAT WASHERS (59), and two 8-32 X 3/16 IN. SCREWS (58) as shown in FIGURE 20.
• Slide one 4" VINYL SLEEVE (47) over the CONTROL LEVER (60). Then SECURELY assemble the CONTROL LEVER (60) to the TAB
on the PRESS ARM (27) using one 3/8" JOINT CONNECTOR CAP (57), two #10 FLAT WASHERS (59), and two 8-32 X 3/16
IN. SCREWS (58) as shown in FIGURE 20.
1/2
0
27
58
59
1/2
1
2
47
PUSH/PULL
CABLE
1/2
1/2
3
19
1/2
1/2
4
5
6

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Serious steel 425104

Table of Contents